beautypg.com

Bradford White DB-80R3DS User Manual

Page 21

background image

Double Element, Simultaneous, Three Phase

Operation.

Water In Tank Is Cold Or Not Enough Hot

Water With Power ON.
1. This procedure assumes line voltage,

ECO and elements are in working order.

2. Adjust temperature setting for both

thermostats to the highest setting.

2. Turn power “ON” to water heater.
3. Set multi-meter to “Volts AC”.
4. Check across terminals L4 and T2 of

upper thermostat (see illustration 18).

A) Rated voltage NOT present,

Recheck ECO (see page 14).

If ECO is okay, replace

thermostat.

B) Rated voltage IS present,

proceed to next step.

5. Check across upper element terminals

(see illustration 19).

A) Rated voltage NOT present,

check wire connections from

thermostat to element.

B) Rated voltage IS present,

Repeat element testing

see page 15.

6. Check across terminals L1 & L3 of

lower thermostat (see illustration 20).

A) Rated voltage NOT present,

check wire connections from

upper to lower thermostats.

B) Rated voltage IS present,

okay, go to step 7.

7. Check across terminals L4 and T2 of

lower thermostat (see illustration 21).

A) Rated voltage NOT present,

Recheck ECO (see page 14). If

ECO is okay, replace thermostat.

B) Rated voltage IS present,

proceed to next step.

8. Check across lower element terminals.

A) Rated voltage NOT present,

check wire connections from

thermostat to element.

B) Rated voltage IS present,

Repeat element testing

see page 15.

WARNING

High voltage exposure. Use caution to avoid

personal injury during this procedure.

Illustration 18

Illustration 19

Illustration 20

Illustration 21

WARNING

Be sure thermostats are reset to their original

temperature settings as found prior to

thermostat testing

Page 21

SERVICE PROCEDURE RE-III

Residential Thermostat Testing

21