Gas control assembly – Bradford White U-TW4-75S-76R-3N User Manual
Page 39
Page 39
Gas Control Assembly to the Thermal Well (cont’d)
Step 2.
Route the wire leads back into relief opening.
Step 3.
Align the slots located on the thermal well flange
with the tabs located on the back of the gas control.
Step 4.
Carefully push the gas control back onto the thermal well flange as far as
possible towards the water heater. Then, slide the gas control down to lock into posi-
tion.
Step 5. Install the burner assembly
and connect the pilot and main feedlines
to the gas control using a 7/16” and 3/4”
wrench, respectively.
Step 6.
Reconnect the wire harnesses to the gas control.
Step 7.
Reconnect the gas piping to the gas control. Re-
store the gas supply and check for gas leaks.
Gas Control Assembly
Wire leads on
thermal well
Relief opening
Slots in thermal well
Tabs on back of gas
control
Pilot and main
feedlines
Wire harnesses
39