Vetter pipe and test sealing bags, 2 support structure – Vetter Pipe and Test Sealing Bags User Manual
Page 10

Vetter Pipe and Test Sealing Bags
Page 10/33
9
Leave the shaft and/or pipeline.
9
Make certain that no staff remain in the area of danger.
9
Inflate the sealing bag to the permitted maximum operating
pressure from a safe position.
There is a danger of the bag catapulting outwards. The pressure
or water column must be completely reduced within the pipeline
before the support structure is removed. Otherwise the sealing
bag could catapult outwards.
After completion of the work, pressure reduction is to be carried
out via the inflation hose (ventilation nipple) or the controller
(pressure reduction via the knurled screw of the safety valve).
Generally this must be made outside the pipeline or shaft.
9
If the water has completely flowed out of the shaft / pipeline
then release the compressed air out of the bag.
9
Now remove the support structure and take the bag out of
the shaft/ pipeline.
4.2 Support structure
The type of support structure depends on the structural factors in
the pipe, the pipe itself and the counter-pressure to be expected.
The following support possibilities are only drawing diagrams and
are given as examples.
General details of support
(presented as a diagram)
1 Bag centre
2 Inflatable bag sleeve
Support suggestion for a ditch
(presented as a diagram)
Support suggestion for a street inlet shaft
(presented as a diagram)