Physical Installation
Compliant Installation
NOTE:
It is important the DS1/E1 Network Interface Cables are secured separately from the
power and Signal Cables.
1. Inspect the unit.
2. Mount the unit, see Wall Mounting on page 2-5, or Rack Mounting on page 2-6 for detailed
instructions.
3. Ground the unit.
WARNING!
T
HE
SEPARATE
PROTECTIVE
EARTHING
TERMINAL
PROVIDED
ON
THIS
PRODUCT
SHALL
BE
PERMANENTLY
CONNECTED
TO
EARTH
. S
EE
3-3.
4. Connect DS1 (T1), Ethernet and Amphenol connectors as needed.
Note: If Amphenol (25-pin telco) connector is used, a ferrite bead is required to meet
compliance (see graphic above).
5. Connect RS-232 connector and open Terminal Emulator software on your PC. Note: With this
running first, you can monitor the boot process.
6. Connect Power to the unit.
7. Monitor the boot process on your PC, when complete the status light should be green.
8. For any software enabled features, enter the key command. See the key command in the Adit
3000 CLI Reference Manual, for detailed information.
9. To verify use the show version command.
10. Now you can proceed to provisioning the unit. See Chapter 4, Configuration for information.
Ferrite Beads
To be compliant with EMI standards, a ferrite bead is required on the following cable:
Ferrite bead shipped with Adit chassis:
Ferrite Provided
Part Number
Intended For
1 large
P/N 010-0051
25-pair Telco cable (connector on the front of the Adit).