Motor Replacement Package

Continued

12. Using small, Flat-blade screwdriver, remove 2 Screws that

connect Motor to Front Flange. Remove Motor. Discard.

To Replace Part

1.

Position new Motor, lining up 2 Screw holes and with wires
as shown in Fig. F . Replace Screws and tighten.

2.

To replace Pinion Gear, line up D shape of Motor shaft and
Gear. Rotate Drive Gear slightly to align teeth of Pinion Gear.
Press on. Must be fully engaged with Drive Gear.

3.

Replace Motor Cover, lining up tab with slot (Fig. D). Do not
pinch wires. Reinstall Motor Cover Screw.

4.

Reinstall End Cap. Secure 6 Screws.

5.

Reattach Overflow Tube to Mechanism.

6.

Reattach 2 Wire Motor Leads, yellow to yellow and green to green.

7.

Position Blade Seal over Mechanism Plate.

8.

Insert Mechanism into Toilet, tucking wires behind Mecha-
nism. Line up and secure 4 Mechanism Screws (Fig. B).

9.

High Profile: To install Extension Tube (Refer to Fig. G):

a. Lubricate sealing surface of Extension Tube Seal with sili-
cone grease.

b. Install Extension Tube Seal on Extension Tube.

c. Install Extension Tube and seal assembly on Mechanism.
Make sure that seal is seated at least 1/2 inch below Mecha-
nism tube lip.

d. Ensure Hose Clamp on Mounting Flange Seal is tight.

e. Lubricate Mounting Flange Seal sealing surface with Sili-

Fig. D

Motor Cover

Fig. E

Screw

Pinion
Gear

Small
screw

Small
screw

Motor Cover Tab

Fig. F

Yellow
Wire

Green
Wire

Mounting
Flange

Fig. G

Shown

separate

for clarity

– these

items

normally

remain

as-

sembled

HIGH
PROFILE
ONLY

Extension
Tube

Mounting
Flange Seal

Extension
Tube Seal

Clamp

Mechanism
Tube Lip

Mechanism

To Replace Toilet To Floor

1.

Secure new Closet Flange Seal, lip side up, to Toilet.

2.

Position Toilet over flange.

3.

Reconnect Water Supply Line.

4.

Reconnect 12-volt power supply to Toilet.

5.

Reconnect RV’s power supply to the Toilet.

6.

Secure to floor with Lag Screws. Tighten.

7.

Turn on RV’s water supply. Press Toilet flush button to close
blade and to flush test.

8.

Resecure Bolt Caps.

cone Grease.

f. Install Mounting Flange and Seal assembly on Extension
Tube. Make sure there is at least a 1/2” overlap between the
Extension Tube and Mounting Flange Seal.

Low Profile: Replace the Mounting Flange Seal onto the lip
of the Mounting Flange. Install Mounting Flange to Mecha-
nism. (No extension tube is used.)

10. Replace 2 Mounting Bushings with flat surface out.