Figure 4-3. foot pad - side view, 1 load cell wiring to junction box, Figure 4-4. corner numbering - top view – Rice Lake Summit 3000 Low-Profile Package User Manual
Page 16: Table 4-3. load cell wiring, In figure 4-3. w

12
Summit 3000 Installation Manual
Figure 4-3. Foot Pad - Side View
Route the load cell cables near each corner so that the cable is free from possible contact with each foot. Hold the
cable in position with the supplied adhesive-backed cable ties.
Do not cut load cell cables. Coil extra cable before it enters the junction box, tie with cable ties, and insert the
coils into the channel near the junction box.
After coiling excess cable, pass each individual end of load cell cable through its grommet in the junction box
cover (or through cable fittings in the NEMA 4X junction box).
Corner correction trimming and calibration is necessary after load cell replacement. Follow instruction in
Sections 3.2 and 3.3.
4.3.1
Load Cell Wiring to Junction Box
The four load cells are each wired to their respective terminals in the junction box according to the corner
numbering system shown in Figure 4-4, and the coloring code in Table 4-3.
Pull excess cable out of the junction box enclosure and tighten the cable grips with a wrench. To be watertight,
the cable grips must be tightened to the point where the rubber sleeving begins to protrude out of the hub. Finally,
pull on each of the four cables to make sure that they do not slip.
Figure 4-4. Corner Numbering - Top View
Cable Color Code
J-Box Terminal
Red
+Excitation
Black
-Excitation
Green
+Signal
White
-Signal
Bare or Clear
Shield
Table 4-3. Load Cell Wiring
2K – 10K models: 1.625"
1
4
2
3