Series 5600 Outside Glazed Installation Instructions

Section V: Frame Assembly

Step #1 Assemble Frame Components

A.)

Assemble shear blocks, splice sleeves, anchors, etc., to the mullions as required per

approved shop drawings.

B.)

Apply sealant to the shear blocks and attach horizontal rails.

Note: On long runs, check overall frame dimensions

at every fifth opening to avoid dimensional build-up.

Overall Dimension Check

Apply sealant to the face of

shear block prior to

installation of horizontal.

After horizontal is in

position, wipe away excess
sealant.

1/2”

Min.

Note: The commercial cut to length tolerance is +/-

1/16”. It is critical to check every fifth unit for location.

Note: The shear block must be leveled, perpendicular to the

verticals, before the #14 attachment screws are tightened.

Interior tubular horizontals are cut
D.L.O. – 1/32”. The erector is to

split this difference on both sides.

** Dimension Check Every 5 Units