beautypg.com

EFCO S5600 Outside Glazed User Manual

Page 23

background image

EFCO CORPORATION 7/2012 PART NO. Y302

Page 23 of 26

Series 5600 Outside Glazed Installation Instructions

Section XIII: Vertical Splice Joints





Note: All anchors must be “FIXED” before glazing installation begins.

Note: When the mullion splice is shop installed into the lower mullion,

shear block screws will be used in standard locations as shown.

Splice sleeve will vary with

the system mullion depth.

Upper mullion is “stabbed”

onto lower mullion splice.

Apply “Bond Breaker Tape” to splice

and insert into lower mullion.

Seal between mullion back
members and tongues, then tool

sealant into joint and smooth.

After infill is in place, apply the pressure
plates and seal between pressure plates.

Then tool sealant into joint and smooth.