M O D E L 2 0 0 / 2 5 0 B L O W E R I N S T A L L A T I O N
Installation
Version 3
High Pressure Blower Installation Guide
A-7
4
Flip arm A over, place the poly washer on the pin, and insert into the main
bracket from the top.
5
Flip arm B over, place the poly washer on the pin, and insert into arm A from the
bottom. Secure Arm B using the bolts, washers, and spacers removed earlier.
Note: Arm B is the only arm with a threaded pin.
6
Replace the four hand knobs removed earlier.
7
Continue with “Installing the Extension Arm Assembly” on page A-3, “Installing
the High Pressure Blower Assemblies” on page A-4, and “Power Hookup” on page
A-5 to complete the blower installation.
Figure A-6: Modify the Extension Arm Assembly—New Arm Configuration
arm B
arm A
arm A
arm B
hand knob
hand knob
hand knob
hand knob
threaded pin
main bracket