Installing the metal feet and bezel – Dell PowerEdge 2800 User Manual
Page 31
Tower-to-Rack and Rack-to-Tower Conversion Guide
29
2
Install the tower control panel assembly.
a
Using a #2 Phillips screwdriver, remove the screw that secures the I/O board to the rack
carrier.
b
Using a #2 Phillips screwdriver, remove the two screws that secure the LCD board to the
rack carrier.
c
Align the I/O board on the tower carrier.
d
Using a #2 Phillips screwdriver, install the screw that secures the I/O board to the tower
carrier.
e
Align the LCD board on the tower carrier.
NOTICE:
The system ID switch plunger is very fragile. When aligning the LCD board on the tower carrier,
be careful not to damage the system ID switch plunger.
f
Using a #2 Phillips screwdriver, install the two screws that secure the LCD board to the
tower carrier.
g
Remove the protective covering from the rack carrier plastic lens.
h
Slide the control panel assembly’s cable through the hole in the drive tray.
i
Align the tabs on the control panel assembly with the slots in the drive tray.
j
Slide the control panel assembly toward the tower front panel until it stops.
k
While holding the control panel assembly in place, install the three screws (that came
with your kit) that secure the control panel assembly to the tower front panel.
3
Inside the drive tray, latch the control panel assembly cable clamp.
4
Connect the control panel assembly cable to the SCSI backplane board.
5
Orient the system as shown in Figure 1-16.
6
Reinstall the hard drives, any optical drives, and devices installed in the media bay in the
system.
NOTE:
Ensure that the hard drives, any optical drives, and devices are reinstalled into the same
positions that they were removed from. The devices should be labeled appropriately.
7
Connect any cables to the devices in the media bay.
8
Slide the drive tray backward and then rotate the drive tray release lever backward until the
drive tray is in the operational position. See Figure 1-16.
9
Tighten the captive screw that secures the drive tray release lever to the drive tray.
10
Install the painted top cover that came with your kit. See Figure 1-15.
Installing the Metal Feet and Bezel
1
Position the system on a flat working surface so that the system is slightly hanging over the
edge. See Figure 1-18.
Y1001bk0.book Page 29 Thursday, July 8, 2004 4:32 PM