Manually starting a program, Manually stopping a program, Generating a graph for a program – Baseline Systems BaseManager 2.0 User Manual
Page 30

Manually Starting a Program
1. In the main BaseManager interface, select the site and controller that you want to manually start a program
for.
a. From the list under the All tab on the left side of the map, click the site. The controllers assigned to that
site are listed below the site name.
b. Click the controller that you want to work with. A blue arrow displays next to the controller that is
selected.
2. Click the Programs tab. The list of programs for that controller display.
3. On the line for the program that you want to start, click the Start Program button.
Note: If the status on the Programs page does not update immediately, check the status in Quick View. When
you click back to the Programs page, the status should be updated.
Manually Stopping a Program
1. In the main BaseManager interface, select the site and controller that you want to manually stop a program
for.
a. From the list under the All tab on the left side of the map, click the site. The controllers assigned to that
site are listed below the site name.
b. Click the controller that you want to work with. A blue arrow displays next to the controller that is
selected.
2. Click the Programs tab. The list of programs for that controller display.
3. On the line for the program that you want to stop, click the Stop Program button.
Note: If the status on the Programs page does not update immediately, check the status in Quick View. When
you click back to the Programs page, the status should be updated.
Generating a Graph for a Program
1. In the main BaseManager interface, select the site and controller that you want to generate a program graph
for.
a. From the list under the All tab on the left side of the map, click the site. The controllers assigned to that
site are listed below the site name.
b. Click the controller that you want to work with. A blue arrow displays next to the controller that is
selected.
2. Click the Programs tab. The list of programs for that controller display.
3. On the line for the program that you want to generate a graph for, click the Action button.
4. Click the View Graph button. The graph displays in the BaseManager page.
5. When you have finished reviewing the graph, click the Return button.