Assembly – Great Plains UT5052 Operator Manual User Manual
Page 16

Section 1: Assembly
Great Plains Mfg., Inc.
Series I UT3030-UT5052 Ultra-Till 576-026M
10/28/2004
14
Assembly
This section covers the proper assembly of the implement. The reference numbers on the
figures give you an indication of the order of assembly. For a complete breakdown of any part not
shown in this assembly section, refer to the parts manual for proper location. Refer to the Appendix
for proper bolt torque values.
Center Frame, Torque Tube & Walking Beam Assembly
After uncrating the machine, place the
center frame (1) Figure 1, in the center of your
work area on stands. Pin the torque tube (2) to
the center frame with the 1 1/4 x 6 pins (3) and
1 1/4 x 7 pin (4) in center. Secure them with
3/8 x 2 1/4 Gr.8 hex bolts (5) & top lock nuts.
Slide the pivot spindle of the walking
beam assembly (6) into the sleeve at the end of
the torque tube wheel arm. It is a good idea to
put some form of anti-seize on the spindle
before you insert it. Line up the hole in the
spindle with the hole in the sleeve and secure
with 5/16 x 4 or 5/16 x 4 1/2 hex bolt (7) with
lock washer and hex nut.
When both walking beams have been
installed, bolt on the center transport tires (8),
using 5/8” lug nuts (9). See parts manual for
proper transport parts and sizes for your
machine model.
Figure 1
4/11/2005