beautypg.com

Great Plains YP825AR Material Rate User Manual

Page 15

background image

Great Plains Manufacturing, Inc.

Table of Contents

Metric Charts

Planting Rate Overview

11

2013-11-11

Table of Contents

Metric Charts

401-923B

5.

Plant at the desired planting speed for slightly more
than the computed sample run length.

6.

Measure off the sample distance, balanced in
between where seeding started and stopped.

7.

Count the number of seeds over the distance
measured. Also note the consistency of the seed
spacing.

8.

Compute the rate for a full acre or hectare.

For a 1/1000th sample, multiply the counted seeds
by 1000.

For a 1/200th sample, multiply the counted seeds by
200.

9.

If the field and chart rates vary by more than a few
percent, re-check planter setup, including meter disk
or cell count, air system, tire size, tire pressures,
sprocket setup, chain slack, etc. If seed spacing is
irregular, this suggests a seed delivery problem, and
not a rate setup problem.

10. While planting, pay attention to the seed monitor. In

addition to confirming the single-row furrow check, it
will also provide field rate data on all the other rows,
and alert you to any irregularities or stoppages.

USc Example:
Sample size:

1/1000th ac

Plant for approximately:

25 feet

Measure the central:

17 feet 5 inches

Metric Example:
Sample size:

1/1000th ha

Plant for approximately:

20 meters

Measure the central:

13.12 meters

USc Example:
Seeds counted:

152

Computed for full acre:

152 x 1000 = 152,000

This differs from chart by:

1%G

Metric Example:
Seeds counted:

300

Computed for full hectare:

300 x 1000 = 300,000

This differs from chart by:

0.6%