Link tube, Tool bar height, Link tube tool bar height – Great Plains 2S-2600HDF Operator Manual v1 User Manual
Page 78

74
2S-2600/F/HD/HDF
Great Plains Manufacturing, Inc.
195-440M
2014-05-16
Link Tube
Refer to Figure 79
The link tube controls folding height of outer end of drill
box. If a drill box does not catch in folding latch when
folding, adjust link length to lower or raise end of box.
1.
Unfold and lower drill.
2.
Pull upper pin
from link clevis
.
3.
Unlock jam nut
.
4.
Thread clevis in or out to lengthen or shorten link.
5.
Replace pin and tighten nut.
Tool Bar Height
Refer to Figure 80
Tool bar height
above ground level
is factory set
and normally does not require adjustment. If you tear
down the drill for repair, or if the tool bar is visibly not
level, spacer washers
on vertical pivot pins allow for a
small amount of tool bar-height adjustment.
To check tool bar height, park drill on a level surface, and
check for correct tire inflation. Measure from ground to
horizontal pivot pin
. If dimension on either side of drill
varies more than
1
⁄
4
inch (6.4mm), adjust tool bar height.
To adjust tool bar height, reposition spacer washers
.
First lower openers and set enough opener down
pressure to help balance frame. Raise tool bar by
removing spacer washers from top of the vertical pivot
and placing them on bottom side of pivot. Lower tool bar
by removing spacer washers from bottom of vertical pivot
and placing them on top of pivot.
Figure 79
Link Tube Adjustment
17307
1
2
3
1
3
2
Figure 80
Tool Bar Height
17306
3
1
2
3
1
2
3
1
3