Field operations, Final field checklist, Planting sequence – Great Plains 2S-2600HDF Operator Manual v1 User Manual
Page 47: Final field checklist planting sequence

Great Plains Manufacturing, Inc.
Operating Instructions
43
2014-05-16
195-440M
Field Operations
This section presumes that all pre-operation checks have
been made on both tractor and drill, and drill is loaded
with seed and any treatments.
Final Field Checklist
Planting Sequence
1.
Lower drill openers at initial seeding point.
2.
Pull forward and begin planting.
3.
Raise drill for turns (meters stop automatically).
❑ Drill hitched, chained and unfolded. See page 14
❑ Set seed and fertilizer drives per charts and calibra-
tion. See page 47 and page 48.
❑ Set drill selector valves (if present) to Markers and
Opener Lift. See page 40 and page 41.
❑ Record acremeter reading if acreage monitoring is
desired.
❑ If installed, Shaft Monitor power ON.
❑ If installed, Point Row Control module ON, and set
for either ALL or SECTION CONTROL.