beautypg.com

Planting, Checking planting rate, Planting checking planting rate – Great Plains 2525A Operator Manual User Manual

Page 34

background image

30

2025A/2525A

Table of Contents

Index

Great Plains Manufacturing, Inc.

118-999M

Table of Contents

Index

2013-06-04

Planting

Perform all steps in “Pre-Start Checklist” on page 19
and “Field Set-Up Checklists” on page 29.

First Pass Operation Checklist

Page

1. Set tractor 3-point hitch to “depth con-

trol” operation (and not load control)

-

2. Unfold marker on next-row side.

28

3. Set fan hydraulic circuit to low flow,

engage circuit. Gradually adjust fan
hydraulic flow to obtain recommended
initial meter pressure.

25

4. Pull forward, lower drill, and begin

planting for a short distance.

5. Stop. Assess:

• planting depth
• seed spacing
• press wheel operation
• fertilizer application (if in use)

6. Make necessary adjustments

32

Sharp Field Turns Checklist

Page

1. Fold marker

28

2. Raise drill

-

3. Make turn

-

4. Lower drill

-

5. Unfold marker on next-row side.

28

6. Resume planting.

Suspending Planting Checklist

Page

1. Stop tractor

-

2. Fan hydraulic circuit to Float or Neutral

24

3. Fold Marker

24

4. Raise drill

-

Ending Planting Checklist

Page

1. Suspend operations as above, then

2. Unload seed

66

3. Lights ON

-

4. Transport

20

Checking Planting Rate

Although the optional seed monitor can report useful full
pass results, cautious practice includes manually check-
ing the seed rate early in the first pass.

The Seed Rate Chart book for this drill (manual part
number 118-999B) contains sampling instructions.

This manual is related to the following products: