Planting, Checking planting rate, Planting checking planting rate – Great Plains 2525A Operator Manual User Manual
Page 34

30
2025A/2525A
Great Plains Manufacturing, Inc.
118-999M
2013-06-04
Planting
Perform all steps in “Pre-Start Checklist” on page 19
and “Field Set-Up Checklists” on page 29.
First Pass Operation Checklist
Page
1. Set tractor 3-point hitch to “depth con-
trol” operation (and not load control)
-
2. Unfold marker on next-row side.
3. Set fan hydraulic circuit to low flow,
engage circuit. Gradually adjust fan
hydraulic flow to obtain recommended
initial meter pressure.
4. Pull forward, lower drill, and begin
planting for a short distance.
5. Stop. Assess:
• planting depth
• seed spacing
• press wheel operation
• fertilizer application (if in use)
6. Make necessary adjustments
Sharp Field Turns Checklist
Page
1. Fold marker
2. Raise drill
-
3. Make turn
-
4. Lower drill
-
5. Unfold marker on next-row side.
6. Resume planting.
Suspending Planting Checklist
Page
1. Stop tractor
-
2. Fan hydraulic circuit to Float or Neutral
24
3. Fold Marker
4. Raise drill
-
Ending Planting Checklist
Page
1. Suspend operations as above, then
2. Unload seed
3. Lights ON
-
4. Transport
Checking Planting Rate
Although the optional seed monitor can report useful full
pass results, cautious practice includes manually check-
ing the seed rate early in the first pass.
The Seed Rate Chart book for this drill (manual part
number 118-999B) contains sampling instructions.