Appendix b - initial setup, Post-delivery checklist, Component replacement dates – Great Plains NP3000A Operator Manual User Manual
Page 164: Appendix b - initial setup post-delivery checklist

407-613M
2014-04-22
160
NP3000 and NP3000A
Great Plains Manufacturing, Inc.
Appendix B - Initial Setup
This Appendix covers setup tasks performed only once,
or at infrequent intervals. Routine setup tasks are
covered in “Initial Setup” on page 35. Some of these
items may already have been done by your Great Plains
dealer:
a.
Field lift partial fold adjustment (page 161)
b.
Flow controller console installation (Option,
page 163)
c.
Parking stand clearance
d.
Frame-mounted row options
(see manual supplied with accessory)
e.
Row drop line connections.
Component Replacement Dates
(anhydrous models only)
Record replace-by dates on the “Replacement Log”,
pages 114 to 116.
If the implement has Great Plains-installed metering,
several components of that system have limited service
lives, and must be replaced before specific dates.
Where these dates are stamped on metal parts, normal
oxidation, and the corrosive effects of extended field
exposure to low levels of anhydrous ammonia vapor, can
render these dates difficult to read soon after the
implement is placed in service.
Post-Delivery Checklist
1.
Read and understand “Important Safety
Information” on page 1.
2.
Check that all working parts are moving freely, bolts
are tight, and cotter pins are spread.
3.
Check that all grease fittings are in place and
lubricated. See “Lubrication and Scheduled
Maintenance” on page 127.
4.
Check that all safety decals and reflectors are
correctly located and legible. Replace if damaged.
See “Safety Decals” on page 9.
5.
Inflate tires to pressure recommended and tighten
wheel bolts as specified. See “Tire Inflation Chart”
on page 143.
Figure 82
REP (Replace-By) Date on Valve
31635