beautypg.com

Carrier DOWNFLOW HORIZONTAL 2-SPEED User Manual

Page 7

background image

2. When completed, downflow subbase, plenum, and furnace (or

coil casing when used) should be installed as shown in Fig. 6.

Step 4—Horizontal Attic Installation

Do not install furnace on its back; safety control operation
will be adversely affected. Never connect return-air ducts to
the sides or back of the furnace. A failure to follow this
warning could result in fire, personal injury, or death.

The furnace can be installed horizontally on either the left-hand
(LH) or right-hand (RH) side. A typical attic installation is shown
in Fig. 8.
CONSTRUCT WORKING PLATFORM
Construct working platform on location where all required furnace
clearances are met. (See Table 1 and Fig. 8.)
INSTALL FURNACE

1. Position furnace in desired location.
2. Connect gas supply pipe. See Fig. 8 for typical piping entry.
3. Connect supply- and return-air ducts.
4. Install field-supplied filter retainers as indicated in Fig. 11 and

Table 4 before connecting return-air duct to furnace.

5. Install 24- X 24-in. sheet metal shield on platform in front of

louvered control panel as shown in Fig. 8.

Step 5—Horizontal Crawlspace Installation
The furnace can be installed horizontally with either the LH or RH
side up. In a crawlspace, furnace can either be hung from floor
joist (see Fig. 9) or installed on suitable blocks or pad. (See Fig.

10.) The furnace can be suspended from each corner by hanger
bolts (4 each 3/8-in. all-thread rod) cut to desired length, 1- X
3/8-in. flat washer, 3/8-in. lockwasher, and 3/8-in. nut. Dimples
are provided for hole locations. (See Fig. 1.)
Since horizontal crawlspace installation is very similar to attic
installation, refer to Step 4. The installation of a sheet metal shield
in front of louvered control panel is covered in Step 4. For a
crawlspace installation, this same sheet metal shield must be
installed above louvered control panel. Extend sheet metal shield
over furnace top far enough to cover gas pipe entry hole.

Step 6—Filter Arrangement

Never operate unit without a filter or with filter access door
removed. A failure to follow this warning could result in fire,
personal injury, or death.

The 2 factory-supplied filters are shipped in the blower compart-
ment. After return-air duct has been connected to furnace, install
filters in a V-formation inside return-air plenum. See Fig. 11 and
Table 4 for horizontal applications. Horizontal filter retainers must
be field supplied. See Fig. 12 for downflow applications.

Step 7—Gas Piping
Gas piping must be installed in accordance with national and local
codes. Refer to the NFGC NFPA 54-1996/ANSI Z223.1-1996.
Canadian installations must be installed in accordance with NSC-
NGPIC and all authorities having jurisdiction.
The gas supply line should be a separate line directly from the
meter to the furnace, if possible. Refer to Table 5 for recom-
mended gas pipe sizing. Risers should be used to connect to the
furnace and to the meter.

Fig. 6—Furnace, Plenum, and Subbase Installed on

Combustible Floor

A96285

DOWNFLOW

SUBBASE

SHEET METAL

PLENUM

FLOOR

OPENING

FURNACE

(OR COIL CASING

WHEN USED)

COMBUSTIBLE

FLOORING

Fig. 7—Furnace, Plenum, and Coil Assembly or Coil

Box Installed on Combustible Floor

A96284

CD5 OR CK5

COIL ASSEMBLY

OR KCAKC

COIL BOX

FURNACE

SHEET METAL

PLENUM

FLOOR

OPENING

COMBUSTIBLE

FLOORING

7

This manual is related to the following products: