Carrier 58DE User Manual
Gas-fired counterflow furnace
Attention! The text in this document has been recognized automatically. To view the original document, you can use the "Original mode".
Number One
Air Conditioning
l\Mer
e
D
c
Carrier Parkway • Syracuse NY 13221
J .*•. S jyy,. ^
.
...
.
: sv
V :
SV.I'rtWiVrt'.Ov.'.N
Gas-Fired Counterflow Furnace
INTRODUCTION
Before installing the furnace, refer to “Procedure for Gas
Furnace Installation” (packaged with the furnace) for infor
mation concerning combustion, venting, piping, and other
standard installation practices. Further reference is made to
the current edition of the American National Standard
Z223.1 National Fuel Gas Code. This publication covers in
stallation, startup, and maintenance.
The Model
58DE
Counterflow Gas-Fired Furnaces are
shipped from the factory completely assembled and internal
ly wired ready for indoor heating installation. The air condi
tioning models have a low-voltage terminal strip for con
venience of field wiring.
The design of the
58DE
Gas-Fired Furnaces is A.G.A. cer
tified for installation on combustible flooring (with use of
optional combustible floor base) in alcoves, closets, or utility
rooms; with either natural or liquefied petroleum gas.
_________ ________________________ _______________________
CLEARANCE REQUIREMENTS
(in inches)
Sides....................................................................................... 1
Back........................................................................................0
Tbp......................................................................................... 1
Vent Connector (single wall)................................................. 6
Type B (double wall)....................................................... 1
Front....................................................................................... 6
Provide service clearance of 30 in. at front of unit.
INSTALLATION
For installation on a combustible floor, see instructions
packaged with the combustible floor base.
For installation on a noncombustible floor, place the furnace
over opening in the floor. Make a seal between the furnace
bottom and the floor to avoid excessive air leakage.
The furnace plenum opening in the floor should correspond
with Figure 5 and Table III.
Installation comprises the following:
*1. Inspection
*11. Location, Ventilation, and Air for Combustion
*III. Gas Piping
*IV. Venting
V. Electrical
VI. Sequence of Operation
VII. Filter Arrangement
VIII. Startup and Adjustment
IX. Care and Maintenance
*Tb perform these sections (or installation steps), refer to
the appropriate sections of “Procedures for Gas-Fired Fur
naces” booklet packaged with this unit.
For accessory installation details, refer to applicable in
stallation literature.
Figure 1 - Model 58DE080
V. ELECTRICAL CONNECTIONS
A. Line-Voltage Wiring
IMPORTANT
: Before proceeding with the electrical connec
tions, make certain that voltage, frequency, and phase cor
respond to that specified on the unit rating plate. Also, check
to be sure that the service provided by the utility is sufficient
to handle the additional load imposed by this equipment. Re
fer to the unit rating plate for equipment electrical require
ments.
l^ecíssesí to «Itet.
Use a separate branch electrical circuit for this furnace. A
disconnecting means must be located within sight of, and
within 50 feet of, the furnace.
B. Low-Voltage Wiring
See Figure 3 for wiring diagram showing the proper field
low-voltage wiring. Make all electrical connections in ac
cordance with the National Electrical Code and any local
codes or ordinances that might apply.
© Carrier Corporation 1977
Form 58DE-1SI