Carrier DOWNFLOW HORIZONTAL 2-SPEED User Manual
Page 23
CHECKLIST
1. Put away tools and instruments, and clean up debris.
2. Check SW-1 through SW-4 after completing installation to
ensure desired settings for thermostat type (SW-1 and SW-2)
and blower off delay (SW-3 and SW-4). Refer to Tables 6 and
7.
3. Verify manual reset switches have continuity.
4. Ensure blower and gas control access doors are properly
installed.
5. Cycle test furnace with room thermostat.
6. Check operation of accessories per manufacturer’s instruc-
tions.
7. Review User’s Manual with owner.
8. Leave literature packet near furnace.
23
This manual is related to the following products:
See also other documents in the category Carrier Kiln:
- 580PB (18 pages)
- 58MXA (12 pages)
- WEATHERMAKER INFINITY 58MXA (12 pages)
- 58TMA (10 pages)
- 58DH (10 pages)
- 58B (2 pages)
- 58DFA (8 pages)
- DELUXE 58SXC (10 pages)
- SERIES 131 58RAV (12 pages)
- 58CLA (8 pages)
- 58MCB (20 pages)
- 4-WAY MULTIPOISE FIXED-CAPACITY DIRECT-VENT CONDENSING GAS FURNACE 58MXA (16 pages)
- A10247 (10 pages)
- INDUCED COMBUSTION FURNACES 58GFA (8 pages)
- 58CMA (12 pages)
- 58CMA (8 pages)
- 58MEC (18 pages)
- UPFLOW 58BTA (20 pages)
- WEATHERMAKER 8000 58WAV (14 pages)
- 58DE (5 pages)
- 58DX (10 pages)
- 58MSA (16 pages)
- 58WAV (10 pages)
- INFINITY ICS 58MVC (14 pages)
- Gas 58MSA (12 pages)
- Furnace (56 pages)
- 58BD (11 pages)
- 58MVC (14 pages)
- 58PAV (14 pages)
- 58PAV (16 pages)
- 58TUA (18 pages)
- 58EFA (6 pages)
- 58VMR (8 pages)
- 58MVB (12 pages)
- 58DP (10 pages)
- 58DP (12 pages)
- 58UVB (14 pages)
- 58HDX (22 pages)
- 58DHL (10 pages)
- WEATHERMAKER 8000 58ZAV (24 pages)
- 58SX040-IBC (8 pages)
- 58SS/DH (8 pages)
- 58SX040 (8 pages)
- 58MTB (18 pages)