beautypg.com

Field operation – Great Plains YP925TD Operator Manual User Manual

Page 40

background image

36

YP625TD and YP925TD

Table of Contents

Index

Great Plains Manufacturing, Inc.

401-755M

Table of Contents

Index

02/23/2011

Field Operation

Perform all steps in “Pre-Start Checklist” on page 19
and “Field Set-Up Checklists” on page 34.

Consult seed monitor for alarms during planting. Check
that reported rates are consistent with your plan.

When reloading seed and fertilizer, check consumption
against anticipated use to that point.

First Pass Operation Checklist

Page

1.

Slide gates open. Shutters set.

32

2.

Raise planter and line up at start of first
planting row.

20

3.

Prime meters with seed.
Leave fan running.

32

4.

Unfold marker on next-row side.

33

5.

Pull forward, lower planter, and begin
planting for a short distance.

20

6.

Stop. Assess:

• planting depth

• seed spacing

• press wheel operation

• fertilizer application (if in use)

-

7.

Make necessary adjustments

38

8.

Resume planting.

-

Sharp Field Turns

a

Checklist

a. Monitor manifold pressure during end-of-pass

operations and turns. Adjust operations as needed
to maintain meter pressurization.

Page

1.

Fold marker

33

2.

Raise planter when fold is complete

20

3.

Make turn

4.

Lower planter

20

5.

Unfold marker on next-row side.

33

6.

Resume planting.

Suspending Planting Checklist

Page

1.

Stop tractor

-

2.

Fan hydraulic circuit to Float or Neutral

30

3.

Hydraulic drive circuit to Float or Neutral

-

4.

Fold Marker

33

5.

Raise planter

20

Ending Planting Checklist

Page

1.

Suspend operations as above, then

2.

Install lift-assist lock

20

3.

Lights ON

-

4.

Transport

21

This manual is related to the following products: