beautypg.com

Field set-up checklists – Great Plains YP925TD Operator Manual User Manual

Page 38

background image

34

YP625TD and YP925TD

Table of Contents

Index

Great Plains Manufacturing, Inc.

401-755M

Table of Contents

Index

02/23/2011

Field Set-Up Checklists

Use the following tables to develop a final checklist for
your tractor/planter configuration. Additional or fewer
steps may be necessary depending on tractor features,
planter options and planting accessories.

Mechanical Checklist (Hitching)

Page

Planter hitched

15

Parking stands raised

15

Lift-assist lock channel installed

20

Electrical Checklist

Page

Verify electrical hookups solid

15

Check seed monitor terminal and observe
any diagnostic messages

a

a. Refer to monitor manual.

Option: Verify that, when planter is
lowered, optional radar speed sensor is
pointed at ground, at an angle
approximately 35

° below horizontal.

b

b. Refer to sensor documentation.

Hydraulic System Checklist

Page

Check tractor hydraulic reservoir full

-

Inspect connections for leaks

-

Perform a raise and lower operation

20

Check fan speed and airflow direction

a

a. Operate fan briefly. Observe rotor blades spinning

toward exit port as fan slows to a stop.

Mechanical Checklist (post-Hitching)

Page

Raise planter.
Remove lift-assist lock

20

Front-to-rear level

17

Marker extension set

120

Marker disc angle set

48

Markers folded (unless already at start of
first planting row)

33

Air System Checklist

Page

Fan butterfly valve set

31

Seed loaded. Lids closed.

23

Meter shutters open to chart value

57

No air leaks (except from seed hoppers)

Hoses and tubing - no sags, no pinches
Check both manifold and sensor lines

Hoses fully connected to meters

Planter Meter Drive Checklist

Page

Check chain lubrication and slack

86

Calibrate speed sensor pulses with planter
lowered.

a

a. Refer to seed monitor manual.

Seeding: Set/check Range and
Transmission against rate chart

b

b. Refer to Seed and Fertilizer Rate manual.

Row Units Checklist

Page

Preset depth handles alike.

54

Preset down force springs alike, except in
tire tracks.

51

Check closing wheel alignment

64

Set press wheels alike, except in tracks.

64

Check action and contact of side depth
wheels

55

Check wheel scraper gaps (if installed)

56

Slide gates open

23

This manual is related to the following products: