Turbo gang placement – Great Plains 4000TT Operator Manual User Manual
Page 26

Section 1: Assembly
Great Plains Mfg., Inc.
Series I 1000TT- 4000TT Turbo-Till 586-043M
12/15/2004
24
Turbo Gang Placement
All turbo gangs are pre-assembled at the
factory. For assembly and diss-assembly of the
turbo gangs and scrapers, refer to the diagram
in section 3 Replacements Parts, Gang
Assembly, page 52.
Arrange the turbo gangs under the
machine as illustrated in Figures 13 thru 18 for
your model machine. Using ¾ x 6 hex bolts
and 5/8 x 6½ hex bolts, hex nuts and lock
washers, bolt the gangs to the gang bars. Refer
to the machine layout diagrams in Section 4,
page 54 for the placement dimensions for
attaching the gangs to the gang bars. Make
sure that the C-shank bearing hangers are
vertical and perpendicular to the gang bar. Also
note the different orientation of the bearing
hanger bracket between right side and left side
(see bottom of Figures 13 thru 18).
Figure 13
3/21/2005