Assembly and setup assistance, Product support pre-assembly checklist, Introduction – Great Plains 4000TT Operator Manual User Manual
Page 15: Pre-assembly checklist
Great Plains Mfg., Inc.
Introduction
1/25/2008
Series I 1000TT- 4000TT Turbo-Till 586-043M
13
Assembly and Setup Assistance
To order additional copies of operator’s and parts
manuals, write to the following address. Include
model numbers in all correspondence.
If you do not understand any part of this manual
or have other assembly or setup questions, assis-
tance is available. Contact
Product Support
Great Plains Mfg. Inc.
PO Box 5060
Salina, KS 67402-5060
Pre-Assembly Checklist
• Before assembling, read and understand “Im-
portant Safety Information,” beginning on
page 1.
• Have at least two people on hand while as-
sembling.
• Make sure assembly area is level and free of
obstructions (preferably an open concrete ar-
ea).
• Have all major components.
• Have all fasteners and pins shipped with
Series I Turbo Till.
• IMPORTANT: If a pre-assembled part or fas-
tener is temporarily removed, remember
where it goes. Keep the parts separated.
• Have a copy of the parts manual on hand. If
unsure of proper placement or use of any part
or fastener, refer to the parts manual.
•
Check that all working parts are moving free-
ly, bolts are tight, and cotter pins are spread.