Initial Setup

These items are completed by the dealer prior to deliver-
ing the drill to the customer.

Tools required
• Basic hand tools

• A tractor of sufficient size and horsepower with remote

hydraulics. Refer to “Specifications and Capacities
in the Operator’s Manual.

If the tractor to be used with the drill is not available
during setup, obtain a measurement of its hitch height.

• About 2.3 gallons (8.4 liters) of hydraulic oil to refill the

tractor hydraulic reservoir after initial charging and
cycling of the hydraulic system.

Pre-Delivery Checklist

4.

Read and understand “Important Safety Informa-
tion
” on page 1 bef
ore assembling.

5.

Have a copy of the drill Parts Manual (150-290P) on
hand. If unsure of proper placement or use of any
part or fastener, refer to the Parts Manual.

6.

Check that all working parts are moving freely, bolts
are tight, and cotter pins are spread.

7.

Check that all safety labels and reflectors are cor-
rectly located and legible. Replace if improperly
located or damaged. Refer to Safety Decals, in the
Important Safety Information” section of the
implement Operator’s Manual.

8.

Inflate tires to recommended pressure as listed on
the “Tire Inflation Chart” on page 58.

9.

Tighten wheel bolts as specified on Torque Values
on page 59.

10. Check for proper slack on all chains.

11. Obtain the hydraulic remote port type/size and hitch

height of the intended field tractor.