beautypg.com

Landing gear installation – E-flite Mini ShowTime 4D ARF User Manual

Page 8

background image

8

E-flite Mini ShowTime ARF Assembly Manual

Landing Gear Installation

Required Parts

Fuselage

Main landing gear

Wheel pant (L&R)
1

3

/

4

-inch (45mm) wheel (2)

4-40 x 3/8-inch socket head screws (2)

#4 black washers (6)

4-40 nut (2)

4-40 locknut (4)

4-40 x 1-inch socket head screw (2)

2mm x 6mm wood screws (2)

Required Tools and Adhesives

Felt-tipped pen

Phillips screwdriver (small)

Drill
Drill bit:

1

/

16

-inch

Needle-nose pliers
Nut driver:

1

/

4

-inch

Hex wrench:

3

/

32

-inch

Note: You may consider using a larger diameter wheel,

such as 2

1

/

4

-inch (58mm) (EFLA224), if your flying site

has rough terrain. By using a larger wheel, you will not

be able to use the included wheel pants.

1. Place the landing gear onto the bottom of the fuselage.

It will angle forward when installed in the correct
direction. Attach with two 4-40 x

3

/

8

-inch socket head

screws and two #4 black washers.