beautypg.com

Battery installation – E-flite Sobre 3D Profile User Manual

Page 27

background image

E-flite Sobré 3D Profile Assembly Manual

3. Glue the bottom SFG into position. Glue the

4.3-inch (110mm) carbon rod to the SFG. Check

that the top and bottom SFGs are still perpendicular

to the wing. Use Foam-compatible CA to glue the

carbon rods to each other and to the wing.

4. Repeat Steps 1 through 3 for the remaining upper

and lower SFG installation.

Battery Installation

Required Parts

Battery
Hook and loop tape

1. Use hook and loop tape to secure the battery to

the underside of the wing. The location of the battery

can be adjusted to correct for the Center of Gravity

described later in this manual.