2 installation, 1 about this chapter, 2 initial installation – Metrohm 850 Professional IC AnCat MCS User Manual
Page 19: About this chapter, Initial installation
■■■■■■■■■■■■■■■■■■■■■■
2 Installation
850 Professional IC – AnCat – MCS
■■■■■■■■
9
2 Installation
2.1
About this chapter
The Installation chapter contains
■
a list of all the steps to be carried out during the initial installation (see
Chapter 2.2, page 9).
■
a schematic overview of the flow paths (see Chapter 2.3, page 11).
■
a description of the construction, connections and functionality of the
instrument.
■
step-by-step installation instructions. A part of these installation tasks
has already been carried out before delivery. They are nevertheless
described here in case they need to be carried out once again some
time in the future (e.g. after maintenance of the high pressure pump).
2.2
Initial installation
Note
A large number of the capillary connections are already connected at
the time the instrument is delivered.
The following steps still have to be carried out after delivery:
Note
Each of the steps numbered 3, 7, 8, 11, 15 and 16 are to be performed
for the anion and cation channels, respectively.
1 Setting up the instrument (see Chapter 2.4, page 14).
2 Remove handle and rollers (see Chapter 2.6.1, page 16).
3 Place the detector in the instrument and connect it (see Chapter
4 Remove transport locking screws (see Chapter 2.6.3, page 21).