4 creating a method, 4 configuration, 1 depot – Metrohm 845 Eluent Synthesizer User Manual
Page 29: Creating a method, Configuration, Depot, N 3.4.1 )
3.4 Configuration
845 Eluent Synthesizer / Instructions for Use 8.845. 8001EN
23
Details Of pH-Adjustment
Field for notes about the pH adjustment that can be in-
cluded in the report (see section 3.4.4), e.g. set pH
value, solution used, etc.
3.3.4
Creating a method
There are 2 ways of creating a method:
• Editing an existing method and saving it under a new name
• Creating a completely new method (by clicking on
or via the
menu
File, New... Method
)
Procedure for configuring a method:
1. Enter
the
Total Volume
to be produced.
2. For
all
Components (except for
Component 1
, see section
3.4.2) enter the desired amount/concentration.
3. Enter
the
Stirrer Speed
.
4. If you want to adjust the pH: configure the pH-adjustment.
5. Save
the
method.
3.4 Configuration
3.4.1 Depot
General information about Depot
The dialog window
DEPOT
can be opened via
Configuration, Depot...
.
The Components (see section 3.4.2) connected to the instrument
need to be defined in the Depot. The numbers correspond to the num-
bers of the Component connections
5 on the instrument.
Window "Depot"
Define and describe each Component connected to the instrument
under the corresponding number. Save the Depot you have drawn up
as a
.meco
file. The settings in the Depot must always be edited when
alterations are made to the connected Components.
The
Methods (see section 3.3) are based on the Depot that was
loaded when they were drawn up. This means that overwriting an exis-
ting
Depot influences the Methods that are based on this Depot.
In order for the mixing process to supply the desired result, the
Com-
ponents specified in the Depot must correspond to the Compo-
nents physically connected to the instrument. The concentrations/-
amounts defined in the
Depot will be used for the volume calculations
in the
Method.