2 installation, 1 setting up the instrument, 1 packaging – Metrohm 845 Eluent Synthesizer User Manual
Page 15: 2 check, 3 location, 2 mains connection, Installation, Setting up the instrument, Packaging, Check
2.1 Setting up the instrument
845 Eluent Synthesizer / Instructions for Use 8.845. 8001EN
9
2 Installation
2.1
Setting up the instrument
2.1.1 Packaging
The 845 Eluent Synthesizer is supplied together with the separately
packed accessories in special packagings containing shock-absorbing
foam linings designed to provide excellent protection. Please store all
these special packagings as only they assure transport of the
instrument free from damage.
2.1.2 Check
After receipt, immediately check whether the shipment is complete and
has arrived without damage (compare with delivery note and list of
accessories in Section 5.2). In the case of transport damage, see in-
structions in Section 5.3.1 "Warranty".
2.1.3 Location
This instrument was developed for internal laboratory use; it should not
be used in explosion-endangered locations.
Place the instrument on a suitable vibration-free laboratory bench, pro-
tected as much as possible from corrosive atmospheres and contact
with chemicals. Choose a location where the temperature is usually be-
tween +5°C and +45°C. The instrument should be protected against
excessive variations in temperature and direct sunlight.
2.2 Mains
connection
Mains cable
The instrument is supplied with one of three mains cables
• 6.2122.020 with plug SEV 12 (Switzerland, …)
• 6.2122.040 with plug CEE(7), VII (Germany, …)
• 6.2122.070 with plug NEMA 5-15 (USA, …)
which are three-cored and fitted with a plug with a grounding pin. If a
different plug has to be fitted, the yellow/green lead (IEC standard)
must be connected to protective ground (protection class 1).
Any break in the grounding inside or outside the instrument can make
it a hazard!
Mains connection
Plug the mains cable into mains connection plug
16 of the 845 Eluent
Synthesizer.