beautypg.com

Un packing and in spec tion .3, Site and shel ter re quire ments .3, Unpacking and inspection – Bird Technologies 8578A100GIG User Manual

Page 13: Site and shelter requirements

background image

Unpacking

and

Inspection

1. Carefully inspect the shipping container for signs

of damage. If damage is noticed, do not unpack

the unit. Immediately notify the shipping carrier

and Bird Electronic Corporation of the damage.

2. If the container is not damaged, unpack the unit.

Save the packing materials for repacking.

3. Inspect all of the components for visual signs of

damage. Immediately notify the shipping carrier

and Bird Electronic of equipment damage or

missing parts.

Site and

Shelter

Requirements

The equipment is not intended for exposed outdoor use, or

use in areas of condensing humidity. The surrounding air

must be free of contaminants or particles that could be

drawn into the air intakes. These load resistors have no in-

termediate dielectric fluids or coolant and require no cooling

water hookups. The unit should be placed where adequate

space is available for air circulation.

Do not enclose the unit in a small room or closet without

proper ventilation. In small rooms or restricted areas, the

heat given off by the unit may increase the ambient temper-

ature to an unacceptable level for sufficient cooling of the re-

sistors.

Introduction

3