Step 4: edge trim installation – USG Curvatura 2x 2 Ceiling System User Manual
Page 7
Page 7 of 8
Step 4:
Edge Trim Installation
C
URVATURA
2
Ј x 2Ј
Ceiling System
Installation
Instructions
Remove any temporary bracing.
Next, follow the Ribbon Diagram to
identify the proper position for each
Edge Trim segment.
Install the Edge Trim by sliding each trim
segment onto to the grid. For ease of
installation, Edge Trim segments are
designed to be about 1/2-inch shorter
than the Main Tee segments.
Fascia Splices and Corner Clips are provided
to cover the gaps.
To install each Fascia Splice, squeeze the
bottom tab to allow a snug fit around the
trim.
Hook the tab over the bottom edge of the
trim. Then, bend over the top of the splice
as shown here. It’s easiest to install Fascia
Splices progressively.
Next, apply Corner Caps. Hook each Corner
Cap over the bottom edge of the trim, then
bend over the top as shown here.
Squeeze the trim against the grid to
ensure a proper fit. Then, screw-attach
the trim segments to the grid with
number-six by three-eighths self-tapping
screws. Be sure to install at least two
screws per trim segment.
B.
C.
D.
E.
F.
G.
H.
I.
A.
- Securock Gypsum-Fiber Roof Board (2 pages)
- BEADEX Lightweight Setting-Type Joint Compounds (2 pages)
- BEADEX Wall and Ceiling Spray Texture FASTEX (1 page)
- BEADEX Quick Spray Decorative Texture (1 page)
- C2 Paired Compasso Channels (12 pages)
- Casting Fireplace Surrounds (32 pages)
- Ceiling System (2 pages)
- Ceiling Retail (8 pages)
- Compositions Decorative Clouds (8 pages)
- DIAMOND Finish Plasters (6 pages)
- DIAMOND Veneer Basecoat Plaster (4 pages)
- DONN Ceiling (8 pages)
- DONN Suspended Ceiling (4 pages)
- DRYSTONE Casting Media Mixing Procedures (2 pages)
- Durock Tile Membrane (7 pages)
- Durock Shower System (16 pages)
- Domed Ceilings and Barrel Vaults (12 pages)
- Drying Plaster Casts (4 pages)
- ENVIRO-SHIELD Bonded Fiber Matrix Application Rates (3 pages)
- Exposed Hanger Solutions (4 pages)
- Fiberock Underlayment and Tile Backerboard (12 pages)
- FIBEROCK Interior Panels Abuse-Resistant (3 pages)
- FIBEROCK Interior Panels AQUA-TOUGH (2 pages)
- Firecode Compound (2 pages)
- Finishing and decorating glass-Mat gypsu M panels (3 pages)
- HYDROCAL Gypsum Cements (2 pages)
- IMPERIAL Basecoat Plaster (4 pages)
- IMPERIAL Gypsum Base (2 pages)
- IMPERIAL Interior Ceiling Gypsum Base Sag-Resistant (2 pages)
- Industrial Plasters and Gypsum Cements for Foundry Applications (1 page)
- Levelrock Floor Underlayment Finished Floor (16 pages)
- Manufactured Housing Handbook (29 pages)
- Metal Ceiling Panels Celebration, Geometrix, Panz, and Paraline (2 pages)
- Moisture, Mold, and Construction Practices Frequently Asked Questions (4 pages)
- Moisture, Mold, and Construction Practices Repairing Water-Damaged Building Systems (2 pages)
- Pixels Wall Mounted (36 pages)
- Plank and Large Panel Stabilizer Bars (16 pages)
- Plasters and Gypsum Cements for the Ceramic Industry (6 pages)
- RED TOP Finish Plaster (1 page)
- RED TOP Gauging Plaster (1 page)
- Structo-Crete Structural Concrete Panel (2 pages)
- Structo-Crete Structural Concrete Panel (1 page)
- Structo-Crete Structural Concrete Panel (9 pages)
- Securock Glass-Mat Sheathing (4 pages)
- Roof Board Applications (3 pages)