beautypg.com

Electric heat, Installation, Preparation – Titus HAB Horizontal Air Handler Belt Drive User Manual

Page 7: Hab installation manual

background image

HAB Installation Manual

IOM-HAB-00

06-30-04

Figure 12. Mixing Box Dimensions

Table 3. Mixing Box Dimensions

Mixing Box Dimensions

Model

A

B

C

D

E

F

Damper Ship Wgt.

(lbs)

CFM

SP

HAB08

8

16

16

6

2

18

(2) 16 x 8

44

800

0.07

HAB12

8

16

16

6

2

27.5

(2) 26 x 8

49

1200

0.08

HAB16

8

20

16

8

4

29

(2) 28 x 8

53

1600

0.1

HAB20

8

20

16

8

4

36

(2) 34 x 8

63

2000

0.07

HAB30

10

25

18

8

7

45

(2) 44 x 10

101

3000

0.06

HAB40

12

32

20

10

10

48

(2) 46 x 12

120

4000

0.03

HAB60

14

40.25

22

12

14.25

58

(2) 56 x 14

197

6000

0.05

HAB80

14

45

22

15

16

66

(2) 56 x 14

205

8000

0.04

Note: All dimensions in inches.

Electric Heat

Preparation

Installation

1. Position heater element section over the blower

wheel of the HAB unit.

Note: Heater baffle must be aligned with the

blower cut-off scroll. Heater should be rotated

180 degrees if necessary to align. This ensures

proper blower discharge of air over the heater

elements.

1.

2.

2. Attach electric heat plenum to unit using #6 or larger

sheet metal screws.

Note: Ensure plenum is securely attached to

HAB unit only and not to blower housing

extension.

Ensure duct materials are compatible for 250º F

operation. Refer to NFPA pamphlet 90A and 90B for

more information.
Ensure ample room exists in the ductwork. Electric

heater must have at least 24 inches of straight duct

clearance before an elbow. If 24 inches are

unavailable, devices such as turning vanes or baffles

may be required.

Note: Electric heaters are incompatible with

discharge equipment.

3. Add insulation, if necessary, to outside of heater

plenum section.

Note: Do not insulate duct heater.

The following figure shows unit and heater components.

7 of 9