Atlas ceiling system iom, Aorcs 4, Installation & operation – Titus Atlas Operating Room Ceiling System (AORCS) User Manual
Page 4
I N S T A L L A T I O N & O P E R A T I O N M A N U A L
Atlas Ceiling System IOM
Installation & Operation
AORCS
4
Installation
Perimeter Grid Member Installation
Wall to wall and Soffit Installations
Install the half-tee grid members at the determined height given on the reflected ceiling documents. Unless a specific benchmark is given in each
room by the construction engineer, install the ceiling at the high point of the floor in each room.
Framing
(by others)
Screw
(by others)
Drywall
(by others)
Gasket
Half Tee
Wall/Soffit Attachment - Half Tee
Horizontal Drywall Perimeter Installations
Full-tee or half-tee grid members can be used in these applications. Fasten half-tees to channels (by others) installed above the drywall. Full-tee
members can be suspended or fastened to channels (by others.) If suspending full tees opening in the ceiling should be ¼ inch larger than the overall
on center length and width of the ceiling system.
Channel
(by others)
Full Tee
Blocking
(by others)
Drywall
(by others)
Gasket
Screw
(by others)
Framing
(by others)
Full Tee
Drywall
(by others)
Gasket
Hanger Wire
(by others)
Channel
(by others)
Half Tee
Drywall
(by others)
Gasket
Screw
(by others)
Direct Attachment - Full Tee
Direct Attachment - Half Tee
Suspended Attachment - Full Tee
-
-
-
-
-
-
-
-