Installation


Perimeter Grid Member Installation

Wall to wall and Soffit Installations

Install the half-tee grid members at the determined height given on the reflected ceiling documents. Unless a specific benchmark is given in each
room by the construction engineer, install the ceiling at the high point of the floor in each room.

Framing

(by others)

Screw

(by others)

Drywall

(by others)

Gasket

Half Tee

Wall/Soffit Attachment - Half Tee

Horizontal Drywall Perimeter Installations


Full-tee or half-tee grid members can be used in these applications. Fasten half-tees to channels (by others) installed above the drywall. Full-tee
members can be suspended or fastened to channels (by others.) If suspending full tees opening in the ceiling should be ¼ inch larger than the overall
on center length and width of the ceiling system.

Channel

(by others)

Full Tee

Blocking

(by others)

Drywall

(by others)

Gasket

Screw

(by others)

Framing

(by others)

Full Tee

Drywall

(by others)

Gasket

Hanger Wire

(by others)

Channel

(by others)

Half Tee

Drywall

(by others)

Gasket

Screw

(by others)

Direct Attachment - Full Tee

Direct Attachment - Half Tee

Suspended Attachment - Full Tee

-

-

-

-

-

-

-

-