6. The contractor assumes the ultimate responsibility for the stability and strength of
the final mounted fixture.
MOUNTING TO A HORIZONTAL SURFACE
An L-bracket can be used to secure the transformer housing to vertical plane above the drop (false)
ceiling. Please refer to the dimensions of the optional bracket in appendix A.
MOUNTING TO VERTICAL SURFACE
Figure 7
1. Prepare your solid surface (joist) with the mounting holes, per the hole locations of the housing
as shown in appendix B.
2. Secure transformer housing to the solid surface (joist), using four (4) 3/8” (M10) bolts, washers
& nuts, as required.
Figure 6
Seismic steel bracket can be used to
secure the transformer housing to solid
ceiling surface or cement ceiling
surface. Minimum ½” (1.2 CM)
diameter bolts are recommended, with
minimum 2” (5.0 CM) depth into the
cement surface.
(This dual mount seismic bracket
comes with DUAL lights only)
NOTE
IT MAY BE NECESSARY TO
MOUNT THE DUAL BRACKET
BELOW THE HARD CEILING AT
A CERTAIN DISTANCE TO
ACHIEVE PROPER FLOOR TO
LIGHT DISTANCE. REFER TO
TABLE 1 AND FIGURE 8.