Transport and installation, Packing, Transport – Retsch RM 200 User Manual
Page 10: Intermediate storage

11/6/2012
10
Retsch GmbH 0002
Transport and installation
Target group: Operating authority, transporter,
operators
Packing
Packing is adapted to the transport route and
conforms to generally applicable packaging guidelines.
Please keep the packing material for the duration
of the guarantee period since if there is a
complaint and the machine is returned with
inadequate packing your guarantee claim will be
at risk.
Transport
The RM200 must not be knocked, shaken or
thrown during transport. Otherwise the electronic
and
mechanical
components
can
become
damaged.
Temperature variations
If temperature variations are high (e.g. during air
transport) the RM200 must be protected against
condensed water. Otherwise the electronic
components can become damaged.
Intermediate storage
Ensure that the RM200 is also stored dry during
intermediate storage.
- BB 50 (41 pages)
- BB 100 (24 pages)
- BB 200 (24 pages)
- BB 300 (24 pages)
- Cryomill (68 pages)
- CryoMill Autofill 50l (28 pages)
- DM 200 (20 pages)
- DM 400 (60 pages)
- Emax (67 pages)
- GM 200 (44 pages)
- GM 300 (44 pages)
- MM 200 (32 pages)
- MM 400 (32 pages)
- PM 100 (44 pages)
- PM 400 (36 pages)
- PM GrindControl (48 pages)
- RS 200 (32 pages)
- SK 100 (24 pages)
- SM 100 (48 pages)
- SM 200 (48 pages)
- SM 300 (44 pages)
- Cyclone - SM 300 (20 pages)
- SR 200 (24 pages)
- SR 300 (24 pages)
- TWISTER (44 pages)
- ZM 200 (32 pages)
- AS 200 jet - Automatic Vacuum Regulation (6 pages)
- AS 200 control - natural frequency (32 pages)
- AS 200 (36 pages)
- AS 200 jet (56 pages)
- AS 200 jet (48 pages)
- AS 200 tap 30.025.0001 (28 pages)
- AS 200 tap 30.025.1001 (28 pages)
- AS 300 (32 pages)
- AS 400 (32 pages)
- AS 400 (28 pages)
- AS 450 basic (40 pages)
- AS 450 basic (44 pages)
- AS 450 control (52 pages)
- DR 100 (40 pages)
- DR 100 (28 pages)
- PP 25 (32 pages)
- PP 40 (28 pages)
- PT 100 (36 pages)