3 disconnecting from the pc, Disconnecting from the pc, Commissioning – Lenze EPM−H410 User Manual
Page 81: F1: msp, Enter: exit 4. press f1 key, See "hmi designer − getting started" manual
Commissioning
Project transfer to the operating unit
Disconnecting from the PC
l
81
EDBPM−H410 DE/EN/FR 4.1
F1
F12
F23
Alarm
Help
Info
shift
Battery
Power
Bus Error
· ±
Space
V W X
7
M N O
4
A B C
0
D E F
1
G H I
1
J K L
2
Enter
Spare
Clr
Esc
P Q R
5
S T U
6
Y Z -
8
+ / =
9
F2
F13
F24
F3
F14
F4
F15
F5
F16
F6
F17
F7
F18
F8
F19
F9
F20
F10
F21
F11
F22
1
0
Ack All
Ack
PgUp
PgDN
H410_007
h410_007
How to transfer a project to the operating unit:
1. Switch on the PC and start the »HMI Designer« planning tool.
2. Switch on supply voltage for operating unit.
3. When the message ENTER to download" appears on the display, press the
enter key
1 of the operating unit.
On the display the following selection is shown:
–
F1: MSP
–
F2: Memory CARD (only if the card is mounted)
–
ENTER: EXIT
4. Press F1 key
0
to activate download via the MSP interface.
5. If the message Waiting for download from MSP" appears on the display,
load the desired project from the »HMI Designer« into the operating unit.
–
See "HMI Designer − Getting started" Manual.
–
PROGRAMMING MODE" is displayed during the download.
When the download is completed, the operating unit is ready for operation and
can exchange data with the connected nodes via the system bus (CAN).
5.2.3
Disconnecting from the PC
How to disconnect from the PC:
1. Switch off PC.
2. Switch off supply voltage for operating unit.
3. Remove EPZ−H110 download cable from the operating unit and the PC.
4. Switch on supply voltage for operating unit.
The operating unit is now ready for operation.