beautypg.com

3 disconnecting from the pc, Disconnecting from the pc, Commissioning – Lenze EPM−H410 User Manual

Page 81: F1: msp, Enter: exit 4. press f1 key, See "hmi designer − getting started" manual

background image

Commissioning

Project transfer to the operating unit

Disconnecting from the PC

5

l

81

EDBPM−H410 DE/EN/FR 4.1

F1

F12

F23

Alarm

Help

Info

shift

Battery

Power

Bus Error

· ±

Space

V W X

7

M N O

4

A B C

0

D E F

1

G H I

1

J K L

2

Enter

Spare

Clr

Esc

P Q R

5

S T U

6

Y Z -

8

+ / =

9

F2

F13

F24

F3

F14

F4

F15

F5

F16

F6

F17

F7

F18

F8

F19

F9

F20

F10

F21

F11

F22

1

0

Ack All

Ack

PgUp

PgDN

H410_007

h410_007

How to transfer a project to the operating unit:
1. Switch on the PC and start the »HMI Designer« planning tool.
2. Switch on supply voltage for operating unit.
3. When the message ENTER to download" appears on the display, press the

enter key

1 of the operating unit.

On the display the following selection is shown:

F1: MSP

F2: Memory CARD (only if the card is mounted)

ENTER: EXIT

4. Press F1 key

0

to activate download via the MSP interface.

5. If the message Waiting for download from MSP" appears on the display,

load the desired project from the »HMI Designer« into the operating unit.

See "HMI Designer − Getting started" Manual.

PROGRAMMING MODE" is displayed during the download.

When the download is completed, the operating unit is ready for operation and
can exchange data with the connected nodes via the system bus (CAN).

5.2.3

Disconnecting from the PC

How to disconnect from the PC:
1. Switch off PC.
2. Switch off supply voltage for operating unit.
3. Remove EPZ−H110 download cable from the operating unit and the PC.
4. Switch on supply voltage for operating unit.
The operating unit is now ready for operation.