beautypg.com

5 commissioning, 1 initial switch-on, Commissioning – Lenze EPM−H410 User Manual

Page 78: Initial switch−on

background image

Commissioning

Initial switch−on

5

l

78

EDBPM−H410 DE/EN/FR 4.1

5

Commissioning

5.1

Initial switch−on

Commissioning requires a complete wiring of the system bus.
Before switching on the supply voltage, check ...

ƒ

the complete wiring for completeness and short circuit,

ƒ

whether the bus system is terminated at the first and last physical node.