Lenze EMF2102IB User Manual
Page 60

Contents
8-28
L
BA2102EN
G
Glossary, 8-26
Group addressing, 5-1
Group formation, of controllers, 6-3
I
Index, 8-27
Initial switch-on. See Installation
Input selection, 8-13, 8-17
Installation
Electrical, 4-3
Mechanical, 4-3
of optical-fibre cables, 4-9
Wiring to a host, 4-4
Wiring via optical fibre (LECOM-LI), 4-8
Wiring viaRS232 (LECOM-A), 4-5
Wiring viaRS485 (LECOM-B), 4-6
Interface, Reduce response time, 6-4
Interface converter, 8-2
L
Labelling, Controller, 1-2
LECOM, Protocol, 8-16
LECOM baud rate. See Baud rate
LECOM code bank. See Code bank
LECOM controller address. See Controller address
LECOM input selection. See Input selection
LECOM-A/B protocol, 6-3, 8-16
Legal regulations, 1-2
Liability, 1-2
List
Abbreviations, 8-25
Technical term. See Glossary
List of abbreviations, 8-25
M
Manufacturer, 1-2
Monitoring of the slave response, 8-24
MULTICAST, 8-24
N
Network topology
Line, 4-6
Point-to-point, 4-5
Ring, 4-8
O
Operating mode, 6-2, 8-3
Operating status, 8-4
Operator, 2-1
Optical fibre
Cable, 4-9
Installation of the optical-fibre ring, 4-9
Optical fibre (LECOM-LI), Features, 4-8
Optical fibre/RS232 converter , 8-2
Optical-fibre cable
Bending radius, 4-9
Installation of the optical-fibre ring, 4-9
Preparation, 4-9
preparation, 4-9
Specification, 8-2
Show/Hide Bookmarks