LED Installation Instructions
1. Attach both Red LED’s to the Center Light Brackets using (4) 1/4-20 x 1 1/4 Screws and Locknuts
for each lamp. Ensure Red LED lenses faces rearward.
2. Attach both Amber LED’s to the outer Light Brackets using (4) 1/4-20 x 1 1/4 Screws and
Locknuts.
3. Attach the Light Module to the Module Bracket using (2) 1/4-20 x 1 3/4 Screws and Locknuts.
4. Layout the Lamp Harness, noting that the connectors marked with Green Tape is Right Side and
Yellow Tape is Left Side.
5. Plug the Lamp Harness into the Light Module, route the plugs with Green Tape along the right
side of the hood top. Plug the 3 prong cord into the Red LED. Plug the 2 prong cord into the
Amber LED.
6. Repeat for the Left Side (Yellow Tape).
7. Plug the 7 Pin Harness into the Light Module, then route the harness up and through the Hose
Support.
8. Bundle and secure excess cord to the Module Bracket with Tie Straps. Secure cords along top of
hood with Tie Straps.
All wires must be firmly attached to machine frame members or hydraulic lines so they do not sag
or become torn loose by field debris.