beautypg.com

Bd-2003 core saw setup & assembly, Caution – Barranca Diamond BD-2003E Pro Series Core Saw User Manual

Page 20

background image

20

BD-2003 CORE SAW

SETUP & ASSEMBLY

MOVABLE CUTTING TABLE INSTALLATION

(A)

While holding the front, position

movable Cutting Table roller wheels

above Guide Rails.

(B)

Seat movable Cutting Table roller

wheels on saw Guide Rails.

(C)

Verify movable Cutting Table is

seated correctly by moving table

back and forth.

CONNECTING THE WATER PUMP

CAUTION

NOTE: To prevent pump damage, the Water Pump must be disconnected if

cutting with a Dry Blade.

To prevent possibility of electrical shock, the BD-2003E must be de-energized

when connecting the water pump.

(A)

Connect the Cooling Transfer

Tube to the inlet connection of

the Blade Guard.

(B)

Connect the Water Pump power

cord to the receptacle found on

motor.

WATER PUMP PREPARATION

(A)

Install Water Pump Dis-

charge Fitting.

(B)

Press one end of the Cooling

Transfer Tube into the Water

Pump Discharge Fitting.

(C)

Slide Cooling Flow Adjusting

Clamp on to the Cooling Trans-

fer Tube.