beautypg.com

Barranca Diamond BD-2003E Pro Series Core Saw User Manual

Page 18

background image

18

BD-2003 CORE SAW

TRANSPORT

TRANSPORTING

CAUTION

The BD-2003E weighs approximately 162 lbs. Use proper lifting techniques and care when lifting

and transporting. NEVER transport the BD-2003E with water in the water basin.

1. Verify the Movable Cutting Head is locked in the down position and the Movable Cutting Table

is removed.

2. Position two people on either side of the saw.

3. From the side, grasp the front and rear of the saw.

4. Lift and transport the saw to the desired work location.

NOTE:

Lock the Cutting Head in the “DOWN” position and remove the Movable Cutting Table

when transporting. The BD-2003E is equipped with forklift brackets for lifting and moving

the saw.

The BD-2003E is designed with legs in the front and rear for ease of transport. To transport:

Cutting Head Locked Down

Transporting the saw

Lift Point

Forklift Bracket

Remove Movable Cutting Table

Lift Point

Forklift Bracket