Caution, Before you begin, Set-up – AMMCO 2800, 2801 Environmental Lathe-Enclosure User Manual
Page 6
4 •
Important: Always read and follow operating instructions.
Before You Begin
Receiving
The shipment should be thoroughly inspected as soon
as it is received. The signed bill of lading is acknowl-
edgement by the carrier of receipt in good condition of
shipment covered by our invoice.
If any of the goods called for on this bill of lading are
shorted or damaged, do not accept them until the car-
rier makes a notation on the freight bill of the shorted or
damaged goods. Do this for your own protection.
NOTIFY THE CARRIER AT ONCE if any hidden loss
or damage is discovered after receipt and request the
carrier to make an inspection. If the carrier will not do
so, prepare a signed statement to the effect that you
have notified the carrier (on a specific date) and that the
carrier has failed to comply with your request.
IT IS DIFFICULT TO COLLECT FOR LOSS OR DAM-
AGE AFTER YOU HAVE GIVEN THE CARRIER A CLEAR
RECEIPT.
File your claim with the carrier promptly. Support
your claim with copies of the bill of lading, freight bill,
invoice, and photographs, if available.
Although AMMCO’s responsibility ceases upon deliv-
ery of the shipment to the carrier, we will gladly assist
in tracing lost shipments. Our willingness to assist in
every possible manner does not make AMMCO respon-
sible for collection of claims or replacement of lost or
damaged materials. Shipping damage claims will not be
handled under warranty.
Set-up
CAUTION
This installation procedure requires two
persons to complete. The Enclosure is large
and heavy and cannot be unpacked, moved,
or positioned safely by one person. The
removal and reinstallation of a lathe requires
two persons.
Use care to avoid dropping or damaging the Enclosure.
Have one person hold the collector while the other
removes packing materials or shipping cartons. During
installation, one person will need to hold the Enclosure
in place on the bench until it is securely fastened to the
bench.
Unpacking the Enclosure
The collector is packed standing on end in the ship-
ping carton. The required brackets and hardware are
included inside the carton. Unpack the unit in an area
large enough to allow the unit to be laid out, opened,
and spread out.
1.
Remove the strapping from the shipping container
and remove the top cover.
2.
Remove the TOOL BOARD and all other items
packed around the Enclosure. Be careful not to scratch
the viewing WINDOW.
Note: The CHIP BUCKET contains the CHIP TUBE, all
the necessary fasteners, and some of the bracketry.
3.
Carefully lay the Enclosure on a pad on the floor.
4.
Slide the lower carton off of the unit.
5.
Stand the Enclosure on end in the middle of the
work area (fig. 1).
Note: Place a pad or blanket under the Enclosure to
avoid damaging the outside surfaces of the unit.
Figure 1 – Stand Unit On End And Open
6.
Open the Enclosure and remove any parts or
materials packed inside.
Important: Use care not to scratch the WINDOW.
Preparing the Bench for Installation
7.
If a lathe is attached to the bench, remove it now.
8.
Move the bench to a position where all sides are
easily accessible, and there is sufficient room to install
the collector.
9.
If the bench has a tool board or sign attached,
remove them now. Be sure to remove all mounting for
the board and/or sign as well.
10.
Clear the bench of all tools and materials.
UP