beautypg.com

Pair mounting – 2N VoiceBlue Next v3.1 User Manual

Page 19

background image

19

2N TELEKOMUNIKACE a.s., www.2n.cz

®

1.

2.

1.

2.

and depend on the installation site conditions.

Having screwed the wings, place the GSM gateway into a free 1U place of the
system rack fitting it with four rack screws (included in the package).

Pair Mounting

Follow the instructions below to rack mount two GSM gateways into one 1U place:

Put the GSM gateways next to each other making their sides touch each other.
Fit the short wings (included in the package) onto the free gateway ends with the
screws enclosed.

Insert the connecting plates (BE CAREFUL! The rear and upper connecting plates
have different drilled holes – the upper plate holes are larger and without
threading) in the upper and rear holes of one GSM gateway first. Then connect
the other unit.