JLG 60HA Parts Manual User Manual
Illustrated parts manual, Model 60ha
Table of contents
Document Outline
- SECTION 1 FRAME
- FIGURE 1-1. FRAME, STEERING AND AXLE INSTALLATIONS - 2WD AND 4WD (WITH 2 WHEEL STEER)
- FIGURE 1-2. FRAME, STEERING AND AXLE INSTALLATIONS - 2WD AND 4WD (WITH 4 WHEEL STEER)
- FIGURE 1-3. TIRE AND WHEEL DRIVE INSTALLATIONS
- FIGURE 1-4. DRIVE MOTOR ASSEMBLY - VICKERS (2WD/2WS)
- FIGURE 1-5. DRIVE MOTOR ASSEMBLY - CESSNA (4WD/2WS)
- FIGURE 1-6. DRIVE MOTOR ASSEMBLY - REXROTH (2WD/4WS AND 4WD/4WS)
- FIGURE 1-7. DRIVE BRAKE ASSEMBLY - AUSCO
- FIGURE 1-8. DRIVE BRAKE ASSEMBLY - MICO (PRIOR TO JULY 1991)
- FIGURE 1-9. DRIVE BRAKE ASSEMBLY - MICO (JULY 1991 TO PRESENT)
- FIGURE 1-10. DRIVE HUB ASSEMBLY (2WD)
- FIGURE 1-11. DRIVE HUB ASSEMBLY (4WD REAR WITH 2WS AND 4WD FRONT AND REAR WITH 4WS
- FIGURE 1-12. DRIVE HUB/BRAKE ASSEMBLY
- FIGURE 1-13. VALVES INSTALLATION (FRAME MOUNTED)
- FIGURE 1-14. CONTROL VALVE ASSEMBLY - 2 SECTION BANG-BANG
- FIGURE 1-15. TOW INSTALLATION
- SECTION 2 TURNTABLE
- FIGURE 2-1. CONTROL VALVES INSTALLATION
- FIGURE 2-2. CONTROL VALVE ASSEMBLY (VICKERS) (PRIOR TO OCTOBER 1994)
- FIGURE 2-3. CONTROL VALVE ASSEMBLY - (VICKERS) (OCTOBER 1994 TO PRESENT)
- FIGURE 2-4. CONTROL VALVE ASSEMBLY - 3 SECTION BANG-BANG
- FIGURE 2-5. CONTROL VALVE ASSEMBLY - 3 SECTION BANG-BANG (2WS) (JUNE 1995 TO PRESENT)
- FIGURE 2-6. ACCESSORY VALVE ASSEMBLY
- FIGURE 2-7. CONTROL VALVE ASSEMBLY - 3 AND 4 SECTION BANG-BANG
- FIGURE 2-8. TURNTABLE, SWING DRIVE AND BEARING INSTALLATIONS
- FIGURE 2-9. SWING MOTOR ASSEMBLY (PRIOR TO AUGUST 1991)
- FIGURE 2-10. SWING MOTOR ASSEMBLY (AUGUST 1991 TO PRESENT)
- FIGURE 2-11. BRAKE ASSEMBLY (PRIOR TO AUGUST 1991)
- FIGURE 2-12. BRAKE ASSEMBLY - AUSCO 37845 (AUGUST 1991 TO PRESENT)
- FIGURE 2-13. SWING HUB ASSEMBLY
- FIGURE 2-14. DEUTZ ENGINE INSTALLATION
- FIGURE 2-15. 110 VOLT GENERATOR INSTALLATION - DEUTZ
- FIGURE 2-16. FORD LSG423 ENGINE INSTALLATIONS - WITHOUT NOISE REDUCTION (PRIOR TO FEBRUARY 1993)
- FIGURE 2-17. FORD LSG423 ENGINE INSTALLATION - WITH NOISE REDUCTION (FEBRUARY 1993 TO FEBRUARY 1995)
- FIGURE 2-18. PRECISION GOVERNOR INSTALLATION - FORD LSG423 ENGINEMACHINES BUILT PRIOR TO FEBRUARY 1995.
- FIGURE 2-19. 110 VOLT GENERATOR INSTALLATION - FORD LSG423 ENGINES MACHINES BUILT PRIOR TO FEBRUARY 1995
- FIGURE 2-20. FORD LRG423 ENGINE INSTALLATION (FEBRUARY 1995 TO PRESENT)
- FIGURE 2-21. GENERATOR INSTALLATION - FORD LRG423 (MACHINES BUILT FEBRUARY 1995 TO PRESENT)
- FIGURE 2-22. DUAL FUEL INSTALLATION (OPTIONAL ON FORD MACHINES)
- FIGURE 2-23. MAIN PUMP ASSEMBLY - GEAR
- FIGURE 2-24. TANKS INSTALLATION
- FIGURE 2-25. ROTARY COUPLING AND COLLECTOR ASSEMBLY AND INSTALLATION
- FIGURE 2-26. GROUND CONTROL BOX ASSEMBLY
- FIGURE 2-27. LIGHTS AND ALARMS INSTALLATION
- FIGURE 2-28. HOODS INSTALLATIONS - STANDARD
- FIGURE 2-29. HOODS INSTALLATIONS - NOISE REDUCTION PACKAGE
- SECTION 3 BOOM
- SECTION 4 PLATFORM
- FIGURE 4-1. STANDARD PLATFORM AND FOOTSWITCH INSTALLATION
- FIGURE 4-2. LOW MOUNT PLATFORMS AND FOOTSWITCH INSTALLATIONS
- FIGURE 4-3. ROTATOR MOTOR ASSEMBLY
- FIGURE 4-4. CONSOLE BOX ASSEMBLY (PRIOR TO JANUARY 1993)
- FIGURE 4-5. CONSOLE BOX ASSEMBLY (JANUARY 1993 TO PRESENT)
- FIGURE 4-6. OPTIONAL COMMON PLATFORM MOUNTED COMPONENTS
- SECTION 5 CYLINDER
- FIGURE 5-1. AXLE LOCKOUT CYLINDER ASSEMBLIES - 2WD (PRIOR TO SEPTEMBER 1992) (USE WITH OPTIONAL OSCILLATING AXLE)
- FIGURE 5-2. AXLE LOCKOUT CYLINDER ASSEMBLIES - 2WD (SEPTEMBER 1992 TO PRESENT) (USE WITH OPTIONAL OSCILLATING AXLE)
- FIGURE 5-3. AXLE LOCKOUT CYLINDER ASSEMBLY - 4WD/2WS (PRIOR TO SEPTEMBER 1992) (USE WITH OPTIONAL OSCILLATING AXLE)
- FIGURE 5-4. AXLE LOCKOUT CYLINDER ASSEMBLY - 4WD/2WS (SEPTEMBER 1992 TO PRESENT) (USE WITH OPTIONAL OSCILLATING AXLE)
- FIGURE 5-5. AXLE LOCKOUT CYLINDER ASSEMBLY - 4WD/4WS (PRIOR TO SEPTEMBER 1992) (USE WITH OPTIONAL OSCILLATING AXLE)
- FIGURE 5-6. AXLE LOCKOUT CYLINDER ASSEMBLIES - 4WD/4WS (SEPTEMBER 1992 TO PRESENT) (USE WITH OPTIONAL OSCILLATING AXLE)
- FIGURE 5-7. LEVEL (UPRIGHT) CYLINDER ASSEMBLY (PRIOR TO APRIL 1992)
- FIGURE 5-8. L EVEL (UPRIGHT) CYLINDER ASSEMBLY (APRIL 1992 TO PRESENT)
- FIGURE 5-9. MAIN LIFT CYLINDER ASSEMBLY (PRIOR TO APRIL 1992)
- FIGURE 5-10. MAIN LIFT CYLINDER ASSEMBLY (APRIL 1992 TO PRESENT)
- FIGURE 5-11. TOWER LIFT CYLINDER ASSEMBLIES (PRIOR TO APRIL 1992)
- FIGURE 5-12. TOWER LIFT CYLINDER ASSEMBLIES (APRIL 1992 TO PRESENT)
- FIGURE 5-13. MASTER CYLINDER ASSEMBLY
- FIGURE 5-14. SLAVE (PLATFORM LEVEL) CYLINDER ASSEMBLIES (PRIOR TO APRIL 1992)
- FIGURE 5-15. SLAVE (PLATFORM LEVEL) CYLINDER ASSEMBLY (APRIL 1992 TO PRESENT)
- FIGURE 5-16. STEER CYLINDER ASSEMBLIES
- FIGURE 5-17. TELESCOPE CYLINDER ASSEMBLY - MAIN BOOM
- FIGURE 5-18. TELESCOPE CYLINDER ASSEMBLY - TOWER BOOM
- FIGURE 5-19. CYLINDER BELLOWS INSTALLATION (OPTIONAL)
- SECTION 6 HYDRAULIC
- FIGURE 6-1. HYDRAULIC DIAGRAM LIST
- FIGURE 6-2. AXLE LOCKOUT HYDRAULIC DIAGRAM
- FIGURE 6-3. HYDRAULIC DIAGRAM - DRIVE (2WD/2WS)
- FIGURE 6-4. HYDRAULIC DIAGRAM - DRIVE (4WD/2WS)
- FIGURE 6-5. HYDRAULIC DIAGRAM - LIFT (MAIN BOOM)
- FIGURE 6-6. HYDRAULIC DIAGRAM - LIFT (TOWER BOOM)
- FIGURE 6-7. HYDRAULIC DIAGRAM - PUMPS
- FIGURE 6-8. HYDRAULIC DIAGRAM - ROTATOR
- FIGURE 6-9. HYDRAULIC DIAGRAM - SEQUENCE
- FIGURE 6-10. HYDRAULIC DIAGRAM - STEER
- FIGURE 6-11. HYDRAULIC DIAGRAM - SWING
- FIGURE 6-12. HYDRAULIC DIAGRAM - TELESCOPE (MAIN BOOM)
- FIGURE 6-13. HYDRAULIC DIAGRAM - TELESCOPE (TOWER BOOM)
- SECTION 7 ELECTRICAL
- SECTION 8 DECALS
- SECTION 9 RECOMMENDED SERVICE PARTS STOCK
- SECTION 10 SPECIAL OPTIONS