Output carrier disassembly, Output carrier disassembly -10, Output carrier -10 – JLG M600 Service Manual User Manual
Page 48

SECTION 3 - CHASSIS & TURNTABLE
3-10
– JLG Lift –
3121813
Output Carrier Disassembly
1. Using a 1/8" diameter punch, drive the Roll Pin (4G)
into the Planet Shaft (4E) until it bottoms against the
Carrier (3A).
2. Using a soft face hammer, tap the Planet Shaft (4E)
out of the Carrier (4A).
3. Using a 1/8" diameter punch, drive the Roll Pin (4G)
out of the Planet Shaft (4E). NOTE: The Roll Pins
(4G) should not be reused when reassembling the
unit.
4. Slide the Planet Gear Sub-assembly (4) out of the
Output Carrier (4A) being careful to not drop the
Needle Bearings (4C) in the process.
Figure 3-4. Output Carrier
4A Output Carrier
4B Thrust Washer
4C Needle Bearing
4D Thrust Spacer
4E Planet Shaft
4F Planet Gear
4G Roll Pin
4H Thrust Washer
This manual is related to the following products: