JLG X700AJ Operator Manual User Manual
Page 104
![background image](/manuals/551897/104/background.png)
SECTION 6 - GENERAL SPECIFICATIONS AND OPERATOR MAINTENANCE
6-8
– JLG Lift –
3128790
Figure 6-3. Component Maintenance Intervals - X700AJ - with Perkins Diesel Engine
PERKINS DIESEL ENGINE
‐ Regarding in‐depth
maintenance of the
engine, see the supplied
manufacturer ’s maintenance.
DETAIL
INTERVENTION
BEFORE
START‐UP
ACCORDING
TO NECESSITY
INTERVAL (HOURS)
10
50
100
250
500
1000
DRY AIR FILTER
CONTROL, CLEANING
•
REPLACEMENT
•
ENGINE OIL
CHECK LEVEL
•
•
REPLACEMENT
•
*
•
MOTOR OIL FILTER
CLEANING
•
REPLACEMENT
•
FUEL FILTER
CLEANING
•
REPLACEMENT
•
WATER SEPARATOR
CLEANING AND
DRAINING WATER
•
•
*
•
COOLING SYSTEM
CHECK LIQUID LEVEL
•
LIQUID ADD./
REPLACEMENT
•
HYDRAULIC OIL
CHECK LEVEL
•
REPLACEMENT
•
HYDRAULIC OIL
FILTER
CARTRIDGE
REPLACEMENT
•
*
•
ARTICULATED
JOINTS
GREASING
•
*
•
BATTERY
CHECK ELECTROLYTE
LEVEL
•
•
GEARBOX OIL
CHECK LEVEL
•
REPLACEMENT
•
*
•
MACHINE
GENERAL PERIODIC
CONTROL
•
•
*
BOOM CABLES
AND SHEAVES
CHECK WEAR
•
**
•
*
REPLACEMENT
•
***
COUPLING ELEMENT
SCREWS TIGHTNESS
CONTROL
•
*
•
PLATFORM MOUNT
PIN NUTS
•
#
#
CHECK TORQUE
200 Nm
Check every year.
If the torque is not
correct replace the nuts
with two new nuts of
the same specification.
Install dry without
using oil or grease to
specified torque.
* First time service interval
then per chart thereafter.
** Every 3 months or
1000 hrs of operation.
*** Every 5 years or
2000 hrs of operation.