beautypg.com

IKA C 7000 Grundausstattung Set 2 User Manual

Page 66

background image

0HVVDJHV DQG 7URXEOHVKRRWLQJ

IKA

-WERKE C 7000

Ver. 07 09.07

3DJH

)DXOW ZLWKRXW VLJQDO IURP &DORULPHWHU

)DXOW

&DXVH

5HPHG\

FDORULPHWHU LQ XQGHILQHG

VWDWXV

Power supply failure

If a test was not being carried out,

switch the system off and on again

to restart it.

If a test was in progress, adopt the

following procedure:

switch the system off and restart

correctly;

remove the decomposition

vessel, release the pressure in it,

and prepare for a new test.

LQFRPSOHWH FRPEXVWLRQ

Quantity of oxygen in bomb was

not sufficient.

Low flammability sample

Check the filling pressure at the

oxygen filling station (30 bar).

Use combustion aid

6LJQDOV IURP WKH & &RROHU

0HVVDJH

&DXVH

5HPHG\

FRQWLQXRXV DFRXVWLF VLJQDO

IURP & FRROHU

Inadequate water supply. When

a critical temperature is reached,

the Peltier elements are

automatically switched off and

the cooling jaws opened to

prevent damage to the cooler.

Restore water supply. When the

temperature falls below the critical

level, the acoustic signal is switched

off, and cooling is resumed.

This manual is related to the following products: