IKA C 7000 Grundausstattung Set 2 User Manual
Page 48
3UHSDUDWLRQ DQG &DUU\LQJ 2XW 0HDVXUHPHQWV
IKA
-WERKE C 7000
Ver. 07 09.07
6HLWH
g
Close the decomposition vessel C 7010 oder C 7012
Place the cover onto the lower section and push down until it presses against the
stop piece in the lower section.
C 7010/ C 7012
Place the union nut onto the lower section and tighten by hand.
The decomposition vessel can now be filled.
h
Finally, the decomposition vessel is filled with oxygen at 30 bar using the C 48 IKA
oxygen filling station. Follow the operating instructions for the C 48 oxygen filling
station.
7KH R[\JHQ SUHVVXUH VKRXOG EH EDU DQG PXVW QRW H[FHHG EDU 8VH TXDO
LW\ R[\JHQ SXUH R[\JHQ
Following preparation of the decomposition vessel, it will be subjected to either a
calibration or a calorific value determination. The two procedures are very similar, so
that they are described together below. Where there are differences these will be
explained.
When the decomposition vessel has been prepared, a calibration or a calorific value
determination is prepared by carrying out the following steps: