beautypg.com

Notice – Briggs & Stratton 7000 WATT 206484GS User Manual

Page 17

background image

17

Final Installation Considerations

Engine Oil

NOTICE

Anyattempttocrankorstarttheenginebeforeithasbeen

properlyservicedwiththerecommendedoilwillresultin

equipmentfailure.

Referto

Maintenanceandenginemanualforoilfill

information.
Damagetoequipmentresultingfromfailuretofollowthis

instructionwillvoidengineandgeneratorwarranty.

Thisengineisshippedfromthefactorypre-runandfilled

withsyntheticoil(APISJ/CF5W-30W).Thisallowsfor

systemoperationinthewidestrangeoftemperatureand

climateconditions.Beforestartingtheengine,checkoillevel

andensurethatengineisservicedasdescribedintheengine

operator’smanual.
NOTE:Theuseofsyntheticoildoes notaltertherequiredoil

changeintervalsdescribedintheengineoperator’smanual.

Battery
Thehomegeneratorissuppliedwithasealed,lead-acid,

rechargeable,1VoltDC33Amp-Hour,350coldcranking

amps(CCA),valveregulatedbattery.Itisinstalledintheunit

andthebatterycablesareconnectedatthefactory.
Withthebatteryinstalled,allwiringtotransferswitchand

homegeneratorcompleted,utilitypowersuppliedtothe

AutomaticTransferSwitch,andthesystemswitchinthe

AUTOposition,thebatteryreceivesatricklechargewhilethe

engineisnotrunning.Thetricklechargecannotbeusedto

rechargeabatterythatiscompletelydischarged.

15 Amp Fuse
Thegenerator’s15Ampfusewasremovedatthefactoryto

preventtheunitfromstartingduringshipping.Yourinstaller

willensurethefuseisproperlyinstalleduponcompletionof

theinstallation.

Fuel Supply System
Ensurethatallfuelpipeconnectionsaretight,secureand

withoutleaks.
EnsurethatallgaslineshutoffvalvesareOPENandthat

adequatefuelpressureisavailablewheneverautomatic

operationisdesired.

Fuel System Selection
TheengineofyourHomeGeneratorSystemisfactory

calibratedtorunonnaturalgas(NG).Itmayalsobe

operatedonliquidpropane(LP)vapor.

To configure the fuel system for LP use:
1. LPfuelinletpressuremustbebetween11and14

incheswatercolumn.

. SetAUTO/OFFswitchtoOFF.
3. TurnOFFthemaindistributionpanelcircuitbreaker

sendingpowertotheautomatictransferswitch.

4. Remove15Ampfuse.
5. Changemainjetinfuelmixerfollowinginstruction

sheetprovidedinLPconversionkit.

6. Reinstall15Ampfuse.
7. Turn

ONthemaindistributionpanelcircuitbreakerthat

suppliesutilitypowertotheautomatictransferswitch.

8. SetAUTO/OFFswitchtoAUTO.
9. ResetexercisetimerfollowinginstructionsSetting

Exercise Timer.

Thegeneratorisnowreadytooperateautomaticallyusing

LPfuel.WithafixedmainjetforLPgas,thereisnoneedto

performanyengineadjustmentsforLPoperation.

Initial Start-up (No Load)

Beforeoperatingthehomegeneratororplacingitinto

service,inspecttheentireinstallationcarefully.
Thenbegintestingthesystemwithoutanyelectricalloads

connected,asfollows:
1. Setgenerator’smaincircuitbreakertoitsON(closed)

position.

. Install15Ampfuseincontrolpanel.
3. Setgenerator’ssystemswitchtoAUTO.
4. PushMANUAL OVER-RIDEbuttononcontrolpanel.
NOTE:Whenthehomegeneratorisstartedforthevery

firsttime,itwillrequirethatairinthegaseousfuellinesbe

purged.Thismaytakeafewminutes.
5. DONOTcrankengineformorethan10seconds,then

pausefor10secondstoreduceheatinthestarter.

6. Repeatprocessuntilenginestarts.
7. Listenforunusualnoises,vibrationorotherindicationsof

abnormaloperation.Checkforoilleakswhileengineruns.

8. Letenginewarmupforaboutfiveminutestoallow

internaltemperaturestostabilize.

9. ConnectanRMSACvoltmeterandafrequencymeter

tocheckgeneratoroutputatloadsideofcircuit

breaker.Voltageshouldbe30-40Volts,frequency

shouldbe6.0-6.5Hz.

10. Checkgeneratoroutputbetweenoneofthegenerator

connectionlugsandtheneutrallug,thenbetweenthe

othergeneratorconnectionlugandtheneutrallug.

Inbothcases,voltagereadingshouldbebetween

115-10Volts.

11. PushandholdMANUAL OVER-RIDEbuttononcontrol

panelagainuntilenginestops.

Installation Inspection
Completethe”InstallationChecklist”asyoumakethe

inspection.Ensureallitemshavebeenfilled-inandall

signatureshavebeenobtained.Instructtheownertomail

thewhitecopyto:

Briggs&StrattonPowerProducts

WarrantyRegistration

P.O.Box39

Jefferson,WI53549-039